2007 – Established in Addis Ababa, Ethiopia with a capacity of 400 tons copper processing facility by 4.400 m2 closed in an area of 25.000 m² in Kaliti.
2010 – First cable manufacturer entitled to get ISO documents in Ethiopia.
2018 – First time to qualify to get on the Golden Tax List in Ethiopia.
2019 – Location for cable manufacturing line changed to Gelan, Addis Ababa by 10.000 m² closed area of total 35.000 m² with 550 tons of copper processing capacity.
2010 – First cable manufacturer entitled to get ISO documents in Ethiopia.
2018 – First time to qualify to get on the Golden Tax List in Ethiopia.
2019 – Location for cable manufacturing line changed to Gelan, Addis Ababa by 10.000 m² closed area of total 35.000 m² with 550 tons of copper processing capacity.